info@deluxeelectro.com
Mon - Sat 8.00 - 18.00. Sunday CLOSED
+971 54 998 5441
Home
About Us
services
Projects
Contact
Emarat Petroleum Fujairah Terminal
Projects
Emarat Petroleum Fujairah Terminal
Project
Details
Client :
confidential
Project :
Emarat Petroleum Fujairah Terminal
SCOPE OF WORK / JOB DETAILS :
ABB MOTOR 1500KW, 3.3KV
Motor major overhauling and motor terminal Re-termination and insulator replaced, Drive end and Non drive end bearing replaced.
Motor tested on offline and online & full load test connected with pump.
Before
service
After
service
Project
Details
Client :
Emarat Petroleum Fujairah Terminal
SCOPE OF WORK / JOB DETAILS – ABB MOTOR 1500KW, 3.3KV
Motor major overhauling and motor terminal Re-termination and insulator replaced, Drive end and Non drive end bearing replaced.
Motor tested on offline and online & full load test connected with pump.
Final service pictures
Main stator service
Terminal Re-Termination and insulator replaced
Rotor dynamic balancing as per ISO Greade